preparation of existing conditions

When the schematic design has been finalized, we will commence the Design Development Phase. The most evident, distinguishing features of these drawings is that they are CAD, computer-based drawings. These drawings begin to refine the design and lay the groundwork for the construction drawings. On average, we find that this phase is normally completed within two to three weeks from the time the schematic design is finalized.

programming
schematic design phase
Design Development
construction document phase
bidding negoation phase
construction administration